KitLog pro

Powered By Kitlog Pro v2.0

Craigs RV-8 Web Site
' style=
Date:  1-1-2018
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Cowl

Drilled the cowl for the Skybolt Cloc studs and temporarily installed the collars and studs to the cowl and the cowl to the airframe. The next step is to make the horizontal cuts on the cowl.
' style=

Using a light inside the cowl to locate the holes

Using a light inside the cowl to locate the holes

' style=

Skybolt Collar and 'O' ring to temporarily mount the collar

Skybolt Collar and 'O' ring to temporarily mount the collar

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.