KitLog pro

Powered By Kitlog Pro v2.0

Brians Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-27-2020
Number of Hours:  3.00
Manual Reference:  OP-10 & OP-11
Brief Description:  2AWG Aft Battery Inst. Master and Starter Solenoid

Installed Tefzel 2 Gauge wiring to aft battery mount and through firewall. Installed both Master and Starter solenoid. Installed 18 AWG Master Power Switch Wire.
' style=

Starter Solenoid installed on firewall.  Installed 2AWG battery wire thorugh Firewall.

Starter Solenoid installed on firewall. Installed 2AWG battery wire thorugh Firewall.

' style=

Master Solenoid on Aft battery tray

Master Solenoid on Aft battery tray

' style=

18 AWG Master Power Switch Wire

18 AWG Master Power Switch Wire

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.