KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  11-18-2019
Number of Hours:  4.00
Manual Reference:  DWG 27A
Brief Description:  Aft Deck and VS 702

Replaced some bad rivets on aft deck, measured and cut 5/8" off the lower front of the VS-702 as per DWG 27A then bolted everthing down and measured to see how close the 1/4" off set was. Will have to do this again a few times before drilling.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.