KitLog pro

Powered By Kitlog Pro v2.0

Eagles Nest Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-28-2012
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Avionics begin!

A pretty good week. We worked on the wiring mostly, although some engine work was done. The propellor is installed, and some of the small stuff on the engine is done. The avionics came, and some has been installed. Another week and most of the wiring will be done.

Not much else to report. We are also hard at work getting ready for Oshkosh. We will have ten students there, along with about a dozen from the Patriot Academy.
' style=

Grandfather/grandson install fuel drain

Grandfather/grandson install fuel drain

' style=

Prop on

Prop on

' style=

Panel taking shape

Panel taking shape

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.