Layed-out both side panels for rear Fuse. Cut and fitted "L"'s and lower Longerons. Installed rear bulkheads (2) on Fuse Bottom (with clecos). Pilot drilled all the "L" and Longeron holes in both side. Attached the sides to the bottom (with cleco's) and check for square and fit.
Fuse bottom and rear bulkheads ready for side skins