KitLog pro

Powered By Kitlog Pro v2.0

BOB'S WEB SITE
' style=
Date:  4-9-2008
Number of Hours:  13.00
Manual Reference:  6T1 & 2
Brief Description:  Assemble Stab

This summary represents 2 Days, Tuesday and Wednesday. Cleco's, deburring, primer, re-cleco, rivet was then done on the Bottom surface of the Stab. This was done after I secured a piece of .063 and produced the tie-downs for the front and rear spar and attached them to the frame. The frame was then secured to the bench top per instructions and the skin fitted, drilled, cleco'ed then dis-assembled and de-burred, primered and re-assembled. It was then turned over and the top skin was closed over the frame and fitted, drilled, cleco'ed, dis-assembled, deburred, and primer'ed. When it was re-assembled 1/2 of the piano hinge was fitted to the top rear spar edge, driled & cleco'ed.
' style=

Stab assembled on bottom open top

Stab assembled on bottom open top

' style=

Stab showig rivet holes ready to close and rivet

Stab showig rivet holes ready to close and rivet

' style=

More shots of line-up pre-rivet/close

More shots of line-up pre-rivet/close

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.