KitLog pro

Powered By Kitlog Pro v2.0

Brians Pietenpol Web Site
' style=
Date:  4-20-2013
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Cleaned out the hangar and got back to working on

I haven't really done much since last fall on the tear drop. After a great Bahamas vacation then came a remodel project at the In-laws, then the Holidays, then a cold snowy winter I just didn't feel like working on a summer project. I spent seveal month getting jigs built for my Pietenpol aircamper and building 32 wing ribs. Now things are warming up so I am back into the tear drop building mood. I ordered the ceiling fan so now I have everything need to wire it all up. I have to finish up gluing a few ceiling pieced and get some interior basic framing finishe then it time to wire it up.
' style=

Shop area cleaned out and organized

Shop area cleaned out and organized

' style=

Tear drop is ready to get back to work

Tear drop is ready to get back to work

' style=

Moved the Tear outside to clean hangar and get work area organized after working on Airplane parts.

Moved the Tear outside to clean hangar and get work area organized after working on Airplane parts.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.