KitLog pro

Powered By Kitlog Pro v2.0

Brians Pietenpol Web Site
' style=
Date:  11-26-2011
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Cut pieces for the Tear floor and tared them for i

Made a trip to Lowes and picked up most of the needed wood for floor, sides, and roof. Cut pieces for the Tear floor and tared them for installation. Used extension cord to figure out shape of sides.
' style=

Picked up material for Tear drop from Lowes

Picked up material for Tear drop from Lowes

' style=

Floor pieces cut

Floor pieces cut

' style=

Use heavy extension cord to figure out shape then draw on plywood sides

Use heavy extension cord to figure out shape then draw on plywood sides

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.