Powered By Kitlog Pro v2.0
Brians Pietenpol Web Site
Air camper
All
4-17-2013
< Previous Log Entry
Next Log Entry >
Date:
4-17-2013
Number of Hours:
2.00
Manual Reference:
Brief Description:
More 2nd side gussets
Put some more 2nd side gussets on and sanded a few more ribs. The end is getting close on rib building.
Used various clamps to hold the 2nd side gussets on whlile epoxy dried
Another rib almost done next to the stack of completed ribs.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
F-19 Sportsman Home
Tear drop camper Home
Air camper Home
Category
# Logs
# Hours
All
70
130
Rib Jig
4
12
Ribs
55
101
Tools
5
7
Wood
6
10
Copyright © 2001-2024 Matronics. All Rights Reserved.