Powered By Kitlog Pro v2.0
My Airplane Projects
RV-12
Final Assembly/Tst
1-5-2011
< Previous Log Entry
Next Log Entry >
Date:
1-5-2011
Number of Hours:
2.00
Manual Reference:
Brief Description:
Paperwork preview.
Al from the FSDO was in town so we did a preliminary run through of all the certification paperwork. He was impressed by Van's thoroughness.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
C120 Home
RV-12 Home
All
Avionics
Condition Inspection
Empennage
Engine
Exterior Finish
Final Assembly
Final Assembly/Tests
Final Assembly/Tst
Finish
Finish Kit
Firewall Forward
Flaperons
Flight Tests
Fuselage
Lighting
Miscellaneous
Modifications
None
Preparation
Shipping
Wheel Pants
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.