Powered By Kitlog Pro v2.0
My Airplane Projects
RV-12
Engine
7-7-2010
< Previous Log Entry
Next Log Entry >
Date:
7-7-2010
Number of Hours:
6.00
Manual Reference:
Brief Description:
Catching up odds and ends.
Spent today catching up on a few things that I had skipped over along the way for various reasons.
Connected the EGT probes and tied down the wires.
Installed the radiator and input and output hoses. Took a lot of time to get the gap right.
Tied down the overflow bottle hose.
Hooked up the heater control.
Installed replacement cotter pins in engine mount bolts.
Installed muffler spring from Van's.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
C120 Home
RV-12 Home
All
Avionics
Condition Inspection
Empennage
Engine
Exterior Finish
Final Assembly
Final Assembly/Tests
Final Assembly/Tst
Finish
Finish Kit
Firewall Forward
Flaperons
Flight Tests
Fuselage
Lighting
Miscellaneous
Modifications
None
Preparation
Shipping
Wheel Pants
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.