Powered By Kitlog Pro v2.0
My Airplane Projects
RV-12
Shipping
12-23-2008
< Previous Log Entry
Next Log Entry >
Date:
12-23-2008
Number of Hours:
5.00
Manual Reference:
06-01
Brief Description:
Picked up crate, read documentation
Picked up crate at H&M. Checked for damage at dented end. Brought home and opened crate to get out documentation package, studied documentation, read manual vertical stabilizer section.
Crate end damage
Up close damage
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
C120 Home
RV-12 Home
All
Avionics
Condition Inspection
Empennage
Engine
Exterior Finish
Final Assembly
Final Assembly/Tests
Final Assembly/Tst
Finish
Finish Kit
Firewall Forward
Flaperons
Flight Tests
Fuselage
Lighting
Miscellaneous
Modifications
None
Preparation
Shipping
Wheel Pants
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.