KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  12-22-2009
Number of Hours:  7.00
Manual Reference:  25-04
Brief Description:  Riveted fuselage/empennage.

Finished cleaning up the shop. Finished clecoing all the way around the fuselage/empennage joint. Prepped the two baggage corner skins and clecoed them in place. Took a break to show the project to Mark and Kurt, and have lunch.

Riveted the sides of the fuselage/empennage joint. Called CJ up to the shop to help me roll the whole assembly up on its side. Safetied with rope overhead. Riveted the bottom skins. Ran the static tube and the trim cable up through the tunnel as far as the rudder pedals.

Can't believe this took me all day!
' style=

Knife edge flight!

Knife edge flight!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.