Removed the fuel sensor and bracket that were temporarily mounted and riveted the mini nutplates that had arrived in the Van's package onto the bracket, and riveted the bracket to the bottom skin. Temporarily reinstalled the -15 bolts. Prepped and primed the roll bar parts. Later stopped by the airport and picked up a couple of -17 bolts.