Powered By Kitlog Pro v2.0
My Airplane Projects
RV-12
All
6-21-2018
< Previous Log Entry
Next Log Entry >
Date:
6-21-2018
Number of Hours:
0.00
Manual Reference:
Brief Description:
Began CI and mods
Over the past two weeks I began the condition inspection, pulled all the covers, changed the oil, and organized all the parts and instructions for the various SB's and improvements.
SB 18-02-03 AST Skin Cracks
SB 18-03-06 Replace throttle springs
SB 18-02-02 Possible HS spar cracks.
Notification 17-12-08 Canopy latch upgrade.
SB 16-05-23 Nose Fork Cracks
Wheel fairing conversion kit
SB 16-08-01 Stabilator Bearing Inspection
Today I removed the HS and AST and began replacement of the AST end ribs. (No cracks found.)
I also planned the echUAT installation, placement of antennas, mounting on the aft bulkhead, etc. Looking for a flexible kid to help!
AST disassembled.
HS removed.
echoUAT planning.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fleet Model 16 Home
C120 Home
RV-12 Home
Category
# Logs
# Hours
All
721
2599
Avionics
12
46
Condition Inspection
29
32
Empennage
44
173
Engine
29
132
Engine
5
102
Exterior Finish
30
140
Final Assembly
32
96
Final Assembly/Tests
32
96
Final Assembly/Tst
32
96
Finish
93
376
Finish Kit
93
376
Firewall Forward
29
132
Flaperons
10
36
Flight Tests
26
46
Fuel System
1
Fuselage
83
311
Lighting
11
44
Miscellaneous
2
4
Modifications
47
56
None
17
Preparation
7
44
Repairs
4
Shipping
3
9
Wheel Pants
18
72
Wings
32
180
Copyright © 2001-2024 Matronics. All Rights Reserved.