KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  6-21-2018
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Began CI and mods

Over the past two weeks I began the condition inspection, pulled all the covers, changed the oil, and organized all the parts and instructions for the various SB's and improvements.

SB 18-02-03 AST Skin Cracks
SB 18-03-06 Replace throttle springs
SB 18-02-02 Possible HS spar cracks.
Notification 17-12-08 Canopy latch upgrade.
SB 16-05-23 Nose Fork Cracks
Wheel fairing conversion kit
SB 16-08-01 Stabilator Bearing Inspection

Today I removed the HS and AST and began replacement of the AST end ribs. (No cracks found.)

I also planned the echUAT installation, placement of antennas, mounting on the aft bulkhead, etc. Looking for a flexible kid to help!
' style=

AST disassembled.

AST disassembled.

' style=

HS removed.

HS removed.

' style=

echoUAT planning.

echoUAT planning.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.