Powered By Kitlog Pro v2.0
My Airplane Projects
RV-12
All
3-27-2013
< Previous Log Entry
Next Log Entry >
Date:
3-27-2013
Number of Hours:
3.00
Manual Reference:
Brief Description:
Continued with inspection.
Performed most engine inspection checklist items. Disconnected left carb and checked bowl - clean as a whistle.
Removed remaining prop hub parts and inspected. Touched up paint on engine flange. Reinstalled prop and set pitch.
Prop ready for inspection.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fleet Model 16 Home
C120 Home
RV-12 Home
Category
# Logs
# Hours
All
721
2599
Avionics
12
46
Condition Inspection
29
32
Empennage
44
173
Engine
29
132
Engine
5
102
Exterior Finish
30
140
Final Assembly
32
96
Final Assembly/Tests
32
96
Final Assembly/Tst
32
96
Finish
93
376
Finish Kit
93
376
Firewall Forward
29
132
Flaperons
10
36
Flight Tests
26
46
Fuel System
1
Fuselage
83
311
Lighting
11
44
Miscellaneous
2
4
Modifications
47
56
None
17
Preparation
7
44
Repairs
4
Shipping
3
9
Wheel Pants
18
72
Wings
32
180
Copyright © 2001-2024 Matronics. All Rights Reserved.