KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  12-14-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Moved parts, prepped for stabilator install.

Drove over to the paint shop and loaded up a bunch of the parts. Lou helped me wrap them in bubble wrap and tie them down. Unloaded at the airport and began to prepare to mount the stabilator.Tim Pearsall stopped by to see the project and helped out for a while. Tim, Tom, Pete and I installed the trim tabs to the stabilator (twice).
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.