KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  12-9-2010
Number of Hours:  2.00
Manual Reference:  PAP G4
Brief Description:  Completed fuel system checks.

Drove to the airport early with the nosewheel pant and measured/marked for access hole installation. Returned home to retrieve the Production Acceptance Procedures (PAP) book.

Performed the G4 PAP section dealing with fuel system tests.This was successful with no leaks and very good fuel flow to the engine and return.

Kurt couln't resist trying out a new use for the nosewheel fairing.

Helped unload a new C195 project coming into the shop.
' style=

Testing the fuel pump.

Testing the fuel pump.

' style=

Captain Conehead.

Captain Conehead.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.