KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  11-4-2010
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Finished roughing right wing, started left.

In the morning I finished roughing up the right wing. I also masked the landing light opening. After lunch CJ came up and helped me swap the wings around. I tested the left wing nav light, masked the stall warning vane, and trimmed the top skin to the 1/8" line. Then roughed up half of the top surface.
' style=

Playing rough.

Playing rough.

' style=

Half done!

Half done!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.