Brief Description: Finished data cable, installed tunnel cover.
Went to Albany for my FAA physical this morning. Now the Arrow annual and my annual are on the same schedule.
This afternoon I finished the data cable hookup. Tested it with a serial extension cable and the serial to USB converter. Was able to communicate just fine between the laptop and the Dynon. See photo 1 for cable routing.
Pinouts as follows:
Dynon DB25 Pin 9 - PC DB9 Pin 5 WHT/BLK Dynon DB25 Pin 10 - PC DB9 Pin 2 WHT/ORG Dynon DB25 Pin 22 - PC DB9 Pin 3 WHT/YEL
Got inside the cockpit and labeled the "spare" wires in the tunnel. Then installed the mounting plates and the tunnel cover.