KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  10-2-2010
Number of Hours:  2.00
Manual Reference:  12-10
Brief Description:  Drilled cone, checked clearances with trim.

Drilled the 3/4" hole in the bottom of the cone. Re-installed stabilizer and trim mechanism. Then put the cone in place to check clearances. Ran the trim full deflection both ways, checked correctness of movement and clearances.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.