Powered By Kitlog Pro v2.0
My Airplane Projects
RV-12
All
7-7-2010
< Previous Log Entry
Next Log Entry >
Date:
7-7-2010
Number of Hours:
6.00
Manual Reference:
Brief Description:
Catching up odds and ends.
Spent today catching up on a few things that I had skipped over along the way for various reasons.
Connected the EGT probes and tied down the wires.
Installed the radiator and input and output hoses. Took a lot of time to get the gap right.
Tied down the overflow bottle hose.
Hooked up the heater control.
Installed replacement cotter pins in engine mount bolts.
Installed muffler spring from Van's.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fleet Model 16 Home
C120 Home
RV-12 Home
Category
# Logs
# Hours
All
721
2599
Avionics
12
46
Condition Inspection
29
32
Empennage
44
173
Engine
29
132
Engine
5
102
Exterior Finish
30
140
Final Assembly
32
96
Final Assembly/Tests
32
96
Final Assembly/Tst
32
96
Finish
93
376
Finish Kit
93
376
Firewall Forward
29
132
Flaperons
10
36
Flight Tests
26
46
Fuel System
1
Fuselage
83
311
Lighting
11
44
Miscellaneous
2
4
Modifications
47
56
None
17
Preparation
7
44
Repairs
4
Shipping
3
9
Wheel Pants
18
72
Wings
32
180
Copyright © 2001-2024 Matronics. All Rights Reserved.