KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  7-7-2010
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Catching up odds and ends.

Spent today catching up on a few things that I had skipped over along the way for various reasons.

Connected the EGT probes and tied down the wires.

Installed the radiator and input and output hoses. Took a lot of time to get the gap right.

Tied down the overflow bottle hose.

Hooked up the heater control.

Installed replacement cotter pins in engine mount bolts.

Installed muffler spring from Van's.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.