Powered By Kitlog Pro v2.0
My Airplane Projects
C120
Elevators
5-17-2012
< Previous Log Entry
Next Log Entry >
Date:
5-17-2012
Number of Hours:
1.50
Manual Reference:
Brief Description:
Began left elevator rebuild.
Unexpectedly had an extra couple of hours at the airport. Drilled out all the rivets on the left elevator, and popped all the welds. Discovered strange tubular stiffener, and way overkill doubler on spar.
Left elevator bottom w/tube.
Spar with old huge doubler.
Bottom rib - cracked.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
C120 Home
All
Elevators
Engine
Horizontal Stab.
Preparation
Rudder
Wings
RV-12 Home
Copyright © 2001-2013 Matronics. All Rights Reserved.