KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  4-11-2018
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Light test, inspection, started drain holes.

Did light test various spots both wings. All good, no light bleed-through. Inspected bottoms. Found one bump that needs to be fixed on left wing. Used 40W Weller iron to start opening drain holes on left wing. Did not work well, too hot. Ordered a small SCR voltage regulator from Amazon to use in controlling temperature of iron. That will be here Monday.Need to fix charred edges on holes and proceed to open remaining holes.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.