KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  3-20-2014
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Continued left wing prep.

Worked with Jeanne in afternoon. Drilled to #30 and deburred all fabric attach holes. Installed wiring for nav lights and future strobes. Modified pitot opening cover to fit. Began installation of pitot /static plumbing.
' style=

Wiring, plumbing.

Wiring, plumbing.

' style=

Pitot cover.

Pitot cover.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.