KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  7-31-2020
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Worked on toe-in

Checked mag timing, still good. Washed down engine, prep for next run oil leak checks. Checked main gear alignment, both wheels out of specs with excessive toe-in. Removed wheels, installed large shim right side, small shim left side.Right side still too far out. More work on this next session.

Put full insurance coverage in place.

Mentored Jane working on N37JP condition inspection.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.