Powered By Kitlog Pro v2.0
My Airplane Projects
C120
All
5-24-2020
< Previous Log Entry
Next Log Entry >
Date:
5-24-2020
Number of Hours:
0.00
Manual Reference:
Brief Description:
Fuel tests, nav lights.
Found black screws in my stock and installed in instruments.
Checked wing for leaks, drained all gas back into two jerry cans.
Cut openings in wingtips for nav lights, fished out wires. Ground down JB Weld repairs for clearance and tapped holes 6-32.
Checked on LED order, confirmed Sandy already ordered.
Tapping retainer screw holes.
Cutting open wingtips.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fleet Model 16 Home
C120 Home
Category
# Logs
# Hours
All
611
1356
Avionics
3
46
Elevators
16
58
Engine
81
102
Engine
6
132
Exterior Finish
11
140
Firewall Forward
6
132
Flight Tests
10
46
Fuel System
6
Fuselage
228
311
Horizontal Stab.
17
65
Interior
12
Lighting
2
44
Miscellaneous
78
4
None
2
Preparation
4
44
Rudder
14
52
Skiis
4
Wheels & Brakes
6
Wings
105
180
RV-12 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.