Powered By Kitlog Pro v2.0
My Airplane Projects
C120
All
4-14-2020
< Previous Log Entry
Next Log Entry >
Date:
4-14-2020
Number of Hours:
0.00
Manual Reference:
Brief Description:
Sam - Baffles, mags, battery.
Sam worked in FBO hangar. Baffles 80% installed. Mag installed, gears synced, nuts finger tight.Battery installed and shimmed with wood blocks.
Discussed washers on exhaust studs and decided to us internal star washers.
Conferred with Jeanne on glareshield treatment. Think we are going with black paint.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fleet Model 16 Home
C120 Home
Category
# Logs
# Hours
All
585
1412
Avionics
1
46
Elevators
16
58
Engine
74
102
Engine
6
132
Exterior Finish
11
140
Firewall Forward
6
132
Flight Tests
5
46
Fuel System
6
Fuselage
227
311
Horizontal Stab.
17
65
Interior
8
Lighting
2
44
Miscellaneous
70
4
Modifications
1
56
None
2
Preparation
4
44
Rudder
14
52
Skiis
4
Wheels & Brakes
6
Wings
105
180
RV-12 Home
Copyright © 2001-2020 Matronics. All Rights Reserved.