Powered By Kitlog Pro v2.0
My Airplane Projects
C120
All
12-30-2018
< Previous Log Entry
Next Log Entry >
Date:
12-30-2018
Number of Hours:
0.00
Manual Reference:
Brief Description:
Two team riveting and motor mount install.
Bill and I finished riveting nearly all of the lower right side doorpost repairs. All AD5 rivets, Bill bucked from inside. Tough job.
Sam and Jeanne ferretted out the motor mount bolts from the T hangar, and installed the mount. Researched and ordered mount-to-engine bolts as well.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fleet Model 16 Home
C120 Home
Category
# Logs
# Hours
All
585
1412
Avionics
1
46
Elevators
16
58
Engine
74
102
Engine
6
132
Exterior Finish
11
140
Firewall Forward
6
132
Flight Tests
5
46
Fuel System
6
Fuselage
227
311
Horizontal Stab.
17
65
Interior
8
Lighting
2
44
Miscellaneous
70
4
Modifications
1
56
None
2
Preparation
4
44
Rudder
14
52
Skiis
4
Wheels & Brakes
6
Wings
105
180
RV-12 Home
Copyright © 2001-2020 Matronics. All Rights Reserved.