KitLog pro

Powered By Kitlog Pro v2.0

My Airplane Projects
' style=
Date:  5-4-2016
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Wheels, rocker bushings, gear box.

In AM washed and repacked wheel bearings, and inserted into wheel halves. Ordered tires. In PM worked on 150 window replacement. In evening Bill finished reaming the rocker arm bushings for the three good cylinders, and worked on the new gear boxes. Jeanne and I removed the brake master cylinders and selected bolts and assembled the left side brake and wheel assembly.
' style=

Bearing inserted.

Bearing inserted.

' style=

Master cylinder before removal.

Master cylinder before removal.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.