Powered By Kitlog Pro v2.0
My Airplane Projects
C120
All
5-17-2012
< Previous Log Entry
Next Log Entry >
Date:
5-17-2012
Number of Hours:
1.50
Manual Reference:
Brief Description:
Began left elevator rebuild.
Unexpectedly had an extra couple of hours at the airport. Drilled out all the rivets on the left elevator, and popped all the welds. Discovered strange tubular stiffener, and way overkill doubler on spar.
Left elevator bottom w/tube.
Spar with old huge doubler.
Bottom rib - cracked.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Fleet Model 16 Home
C120 Home
Category
# Logs
# Hours
All
585
1412
Avionics
1
46
Elevators
16
58
Engine
74
102
Engine
6
132
Exterior Finish
11
140
Firewall Forward
6
132
Flight Tests
5
46
Fuel System
6
Fuselage
227
311
Horizontal Stab.
17
65
Interior
8
Lighting
2
44
Miscellaneous
70
4
Modifications
1
56
None
2
Preparation
4
44
Rudder
14
52
Skiis
4
Wheels & Brakes
6
Wings
105
180
RV-12 Home
Copyright © 2001-2020 Matronics. All Rights Reserved.