Powered By Kitlog Pro v2.0
My Airplane Projects
C120
All
5-10-2012
< Previous Log Entry
Next Log Entry >
Date:
5-10-2012
Number of Hours:
6.00
Manual Reference:
Brief Description:
Aligned trailing edges, drilled.
Tom had the rudder all jigged up when I came in about 9. Set up the laser and drilled the traling edges. Final trimmed the opening for the position light. Match drilled for the cap. Did a bunch of engine related research.
Lined up with laser.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
C120 Home
All
Elevators
Engine
Horizontal Stab.
Preparation
Rudder
Wings
RV-12 Home
Copyright © 2001-2013 Matronics. All Rights Reserved.