Completed the manufacture of the remaining two tie downs.
The tie down brackets were marginally oversized compared to the diomensions on the plans so I just used the belt sander to remove the excess maerial - worked great - quick and easy.
I then marked out the correct position of the irst hole to be drilled the the tie down brackets. As all the alignments for the tie down brackets are dependant on the position of this hole. I studied the plans numerous times and measured multiple times too. Confident it is right! ;)
Spacers manufactured and tie down brackets trimmed to size
Tie down brackets close-up
Position of first hole on tie down bracket marked out as per plans