KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  1-15-2011
Number of Hours:  1.50
Manual Reference:  
Brief Description:  F/Tanks: Prep for proseal

I masked off all the areas that will receive pro-seal with insulation tape and the scuffed it up using a scotchbrite pad. I then removed the insulation tape and cleaned it all up with acetone.

At the drain plugs, I masked in such a way that there would always be a way for any water to reach the drain plug after the pro-seal application
' style=

Both skins scuffed and ready for proseal

Both skins scuffed and ready for proseal

' style=

Closer view of the filler cap area

Closer view of the filler cap area

' style=

A closer view of the way the drain plug was masked

A closer view of the way the drain plug was masked

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.