Powered By Kitlog Pro v2.0
Gary's RV8 Construction Log
RV-8
Empennage
1-24-2008
< Previous Log Entry
Next Log Entry >
Date:
1-24-2008
Number of Hours:
1.50
Manual Reference:
Brief Description:
Elev: Finished stiffeners and match drilled elevat
I finished off all the stiffeners for the left elevator using the scotchbrite wheel. They're now all silky smooth on the edges.
I then match drilled the right elevator that I had previously cleco'd then cleco'd up the left elevator and match drilled it.
Left elevator stiffeners all finished
Right Elevaltor Match Drilled
Left Elevator match drilled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
238
414
Empennage
95
134
Fiberglass: Emp
27
30
Other
4
Wings
101
212
Workshop
11
38
Copyright © 2001-2024 Matronics. All Rights Reserved.