KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  6-19-2007
Number of Hours:  1.00
Manual Reference:  
Brief Description:  RD: Match drilled top rib, final drilled spar web

Fluted the forward flange of R703 to adequately accept the R713 counter balance skin. It took a tad more "manipulation" than I anticipated to get the holes to line up decently but it worked out in the end. Then cleco'd and match drilled the two together.

Final drilled all the holes in the spar web and match/final drilled all the Rudder horn assembly holes.
' style=

Top Rib (R703) fluted and Counter Balance skin (R713) match drilled and cleco'd in place

Top Rib (R703) fluted and Counter Balance skin (R713) match drilled and cleco'd in place

' style=

Final drilling spar web and rudder horn

Final drilling spar web and rudder horn

' style=

The rudder horn assembly match drilled

The rudder horn assembly match drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.