KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  6-3-2007
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Inspection and closing up both VS and HS

The inspector (AP) arrived at around 09h30 and proceeded to go through everyting that I had ready. It would appear that my initial apprehension was completely unnecessary as he had nothing but good comments about my work thus far which left me feeling really stoked. I must admit though, I did breath a huge sigh of relief when he placed his stamp on all the appropiate places on the HS, VS and signed off my builders log.

After the inspection, I riveted the VS rear spar to the VS using the pneumatic squeezer for all the rivets baring obviously the pop rivets for VS708.

The horizontal stab followed suite and within short order I had te beginnings of an RV in my garage! - by the way, that pneumatic squeezer truly is a pleasure.
' style=

All stamped up and good to go!

All stamped up and good to go!

' style=

Closing up the HS

Closing up the HS

' style=

I'll be damned if it ain't startin' to look like an aeroplane in my garage!!! :D

I'll be damned if it ain't startin' to look like an aeroplane in my garage!!! :D

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.