Gary's RV8 Construction Log
' style=
Date:  1-17-2010
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Tie Down Manufacture - 2 (cont)

Using a bolt to align the center of the platenuts, I clamped the platenuts into position (having cut them slightly larger, I was able to angle the platenuts to ensure better edge distances for platenut rivets).

I match drilled all the platenut rivet holes ad then countersunk the spacers as per the plans.
' style=

Platenuts aligned and clamoed into position

Platenuts aligned and clamoed into position

' style=

Platenuts' rivet holes drilled.

Platenuts' rivet holes drilled.

' style=

All match drilling and countersinling completed

All match drilling and countersinling completed

' style=