KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  9-14-2008
Number of Hours:  1.50
Manual Reference:  
Brief Description:  L-Elev: Complete understructure, match drill, debu

Continued with the construction of the understructure. The control horn rear spar for the trim tab were constructed and final drilled. Thereafter, all was dis-assembled and everything (skin and understructure) had the edges finished (filed and scotchbrite wheel to smooth it out) and all holes were deburred. Once again, the cogsdill deburrer making short work of the process.

The left elevator is really moving along quickly!
' style=

Continuing with understructure assembly - WD605 control horn in place

Continuing with understructure assembly - WD605 control horn in place

' style=

Understructure assembly completed and skin match drilled

Understructure assembly completed and skin match drilled

' style=

Left elev disassembled and skin and understructure deburred

Left elev disassembled and skin and understructure deburred

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.