KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  9-7-2008
Number of Hours:  1.00
Manual Reference:  
Brief Description:  R-Elev: Priming

Washed down all the parts, dried them off and then prep'ed the metal with AQL CPD001 (basically a light acid wash). Spraying it all after that was quick though. The time is all in the preperation though it seems
' style=

Inside of the R-Elev skin - priming complete

Inside of the R-Elev skin - priming complete

' style=

Various parts of the R-Elev understructure suitably primed

Various parts of the R-Elev understructure suitably primed

' style=

R-Elev spar primed and ready to have the nutplates rivetted on.

R-Elev spar primed and ready to have the nutplates rivetted on.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.