Washed down all the parts, dried them off and then prep'ed the metal with AQL CPD001 (basically a light acid wash). Spraying it all after that was quick though. The time is all in the preperation though it seems
Inside of the R-Elev skin - priming complete
Various parts of the R-Elev understructure suitably primed
R-Elev spar primed and ready to have the nutplates rivetted on.