KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  2-13-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  L F/Tank: Installed outboard rib and extra pro-sea

I prosealed and rivetted the outboard rib in place with the pneumatic squeezer - fillet the rib as required. I then prosealed the electrical cable of the capacitance senders to the vent pipe and encapsulated the electrical fittings with proseal. That then the left fuel tank ready for inspection! ;)
' style=

Electrical fitting on Capacitance senders prosealed closed

Electrical fitting on Capacitance senders prosealed closed

' style=

Outboard rib pro-seald with some extra to hold the vent pipe

Outboard rib pro-seald with some extra to hold the vent pipe

' style=

L F/Tank ready for inspection

L F/Tank ready for inspection

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.