Powered By Kitlog Pro v2.0
Gary's RV8 Construction Log
RV-8
All
1-27-2011
< Previous Log Entry
Next Log Entry >
Date:
1-27-2011
Number of Hours:
1.00
Manual Reference:
Brief Description:
L F/Tank: Fitted the vent pipe
I straightened an appropriate length of Alu tubing and bent two 45 deg bends such that the vent pipe sat perfectly snugle on the corresponding fitting on the inboard rib without needing to be tightened.
Fitting the vent pipe
Bent as per spec and fitting snuggly
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
238
414
Empennage
95
134
Fiberglass: Emp
27
30
Other
4
Wings
101
212
Workshop
11
38
Copyright © 2001-2024 Matronics. All Rights Reserved.