KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  1-13-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  R F/Tank: Dimpled skin and prep for pro-seal

I removed the blue plastic with a soldering iron. Dimpled the skin with the DRDT-2 dimpler and then started prepping the skin for the rivetting of the stiffeners by cleaning it with acetone and masking it off with insulation tape.
' style=

Plastic removed before dimpling

Plastic removed before dimpling

' style=

Dimpling skin with DRDT-2

Dimpling skin with DRDT-2

' style=

Masking off the skin with plastic insulation tape in prep for proseal

Masking off the skin with plastic insulation tape in prep for proseal

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.