KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  11-1-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  R F/Tank: Manufactured vent pipe clamp

Manufactured the clamp for the overflow/breather pipe on the right fuel tank. I used the same process as per the left tank which was basically to wrap a pre-cut peice of aluminium around the shank of a 1/4" drill bit. It worked like a charm and I ended up a very neat snug fitting clamp.
' style=

Wrapping the Alu. around the shank of a 1/4

Wrapping the Alu. around the shank of a 1/4" drill bit

' style=

Perfect shaped clamp

Perfect shaped clamp

' style=

Finished clamo cleco'ed in place on the fuel filler

Finished clamo cleco'ed in place on the fuel filler

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.