KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  10-24-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  F/Tanks: Capacitance Fuel Sender Installation

I measured the position of the capacitance senders for each respective rib as per the instructions. I then clamped the sender plates on position and match drilled the ribs using the sender plates as a guide.

I cleaned up each nylon washer, removing all the little plastic peices that didn't belong, also making sure that no unwanted peices of plastic could end up in the fuel some time down the line.

I then cleaned up the sender plates and the ribs, deburring and edge-prepping as required. I cut the nylon tubing to the desired length as per the instructions and then assembled everythin for a "test fit". All seemed to work out okay!
' style=

Sender plate position marked out and ribs match drilled

Sender plate position marked out and ribs match drilled

' style=

All the nylon washers cleaned up and unwanted plastic removed

All the nylon washers cleaned up and unwanted plastic removed

' style=

Sender plate construction complete and mounted in place

Sender plate construction complete and mounted in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.