KitLog pro

Powered By Kitlog Pro v2.0

Gary's RV8 Construction Log
' style=
Date:  10-5-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Z Brackets: Drilling to right tank baffle

I drilled the inboard most z-brackets using the fuel tank baffle and ribs as a guide. I then removed the right leading edge from the spar to allow access to the outboard most z-bracket. The outboard most z-bracket was drilled once again using the baffle/rib as a guide. The remaining tank assembly was then cleco'ed to the in- and outboard most z-brackets. The tank skin and inner ribs were removed from the assembly, exposing the baffle. The baffe was the used as a guide to drill the remainder of the z-brackets.
' style=

outboard most z-bracket drilled

outboard most z-bracket drilled

' style=

Fuel tank skin and inner ribs removed to allow drilling of baffle

Fuel tank skin and inner ribs removed to allow drilling of baffle

' style=

baffle and z-brackets drilled

baffle and z-brackets drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.