Powered By Kitlog Pro v2.0
Gary's RV8 Construction Log
RV-8
All
10-3-2010
< Previous Log Entry
Next Log Entry >
Date:
10-3-2010
Number of Hours:
1.00
Manual Reference:
Brief Description:
R F/Tank: Cleco together
Removed the left tank from the wing spar.
Cleco'ed the right tank together in preperation for the drilling of the right Z-brackets/baffle plate
Left tank removed from spar after drilling
assembling the right furl tank
right tank ready for drilling of baffle/z-brackets.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
238
414
Empennage
95
134
Fiberglass: Emp
27
30
Other
4
Wings
101
212
Workshop
11
38
Copyright © 2001-2024 Matronics. All Rights Reserved.