KitLog pro

Powered By Kitlog Pro v2.0

The Joyce Family RV-7A
' style=
Date:  11-22-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fabricated and installed the tie down assemblies

Threaded the tie down extruded stock.
Fabricated the spacers.
Primed the parts.
Riveted the spacers to the tiedown stock.
Bolted to the main spars including aileron belcrank mounts.

Main spar prep finished.
' style=

Tie down and spacers

Tie down and spacers

' style=

Installed

Installed

' style=

Aileron Belcrank mount

Aileron Belcrank mount

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.