Powered By Kitlog Pro v2.0
Aviation Partners, LLC Project
RV-10
Wings
6-2-2011
< Previous Log Entry
Next Log Entry >
Date:
6-2-2011
Number of Hours:
7.00
Manual Reference:
Section
Brief Description:
Fabricated aileron torque tubes
Completed Sections 23-2 and 23-3 by fabricating both left and right aileron push rods and torque tubes. The inside of all tubes was primed by filling and then emptying each tube with self etching zinc chromate epoxy primer.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
303
4002
Avionics
32
566
Empennage
24
254
Engine
7
79
Final Assembly
10
69
Firewall Forward
7
159
Flight Testing
2
67
Fuselage
157
1972
Interior
3
41
Miscellaneous
3
22
Paint
17
398
Prop
1
140
Wings
40
235
Copyright © 2001-2024 Matronics. All Rights Reserved.