KitLog pro

Powered By Kitlog Pro v2.0

Aviation Partners, LLC Project
' style=
Date:  12-26-2011
Number of Hours:  34.00
Manual Reference:  Section 45
Brief Description:  Continued with installation of front and side wind

We completed the attachment of the front window as called out in Section 45, by laying up 10 layers of varying widths of E glass. This has been followed up by addional layers of West System 105 epoxy mixed with Faring filler 407. The photos were taken while it was still wet. The top of the windscreen was first filled with epoxy mixed with micro balloons. This was followed by a 1" strip of 3 oz. E glass and then a 3" strip of 6 oz. E Glass. The side windows are shown with the first 1" strip of 3 oz. E glass. Another layer will follow and then the body work will begin.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.